new
manufacturers
installations
collection
restorations
timeline
identification
publications
glossary
mailing list
site map
links
about
contact

revo b19 (with revo c12423)

side #1

This bracket originally had a broken finial and was fitted with a Thorn Beta 5. This, clearly, would not do.

side #2

The broken finial, and lantern, were removed, and all the paint was stipped.

front #1

Repainted green, fitted with a new finial, and retrofitted with a REVO C12423 fitting, this is how this bracket probably originally looked.

finial closeup

REVO produced the largest of the 'spiked' finials.

spigot decoration

And this is the elegent 'leaf joint' which secures the bracket to the spigot. Unfortunately it was often a weak link, and some would snap just above the spigot.