
The division of Cane Hill into fire zones.
Medium: 800x595: 372KB
Large: 1600x1190: 1.09MB
|
From The Laura Files, this collection of photocopied plans partitioned Cane Hill into fire zones.
Despite some pieces being missing, it's an almost complete document of Cane Hill and includes the only known plans
of the basement, modern boiler house and John Hutchingson Centre.
They're undated but some parts of the hospital had already been closed long enough for them to be 'unfit for use'.
These plans are the basis for my room numbering scheme of Cane Hill. If you see a number by a picture taken inside
the hospital, it'll refer to these plans. The number will take the form of the fire zone and room number so 2:G19 is
the main Chapel.
- Doctors' Residence : Second Floor. (Plan 1/Zone 1).
- Personel/Doctors' Residence : First Floor. (Plan 1/Zone 1).
- Administration : Ground Floor. (Plan 1/Zone 1).
- Administration : Basement (Plan 1/Zone 1).
- Chapel : First Floor. (Plan 2/Zone 2,21,22).
- Chapel : Ground Floor. (Plan 2/Zone 2,21,22).
- Browning Ward : First Floor. (Plan 3/Zone 3). Missing.
- Blake Ward : Ground Floor. (Plan 3/Zone 3).
- Andrewes Ward : First Floor. (Plan 4/Zone 4).
- Alleyn Ward : Ground Floor. (Plan 4/Zone 4).
- Cruden Ward : First Floor. (Plan 5/Zone 5).
- Chaucer Ward : Ground Floor. (Plan 5/Zone 5).
- Donne Ward : Second Floor. (Plan 6/Zone 6).
- Donne Ward : First Floor. (Plan 6/Zone 6).
- Dickins Ward : Ground Floor. (Plan 6/Zone 6).
- Ellis Ward : First Floor. (Plan 7/Zone 7).
- Ellis Ward : Ground Floor. (Plan 7/Zone 7).
- School Of Nursing : Second Floor. (Plan 8/Zone 8).
- Ferrier Ward/Geere Centre : First Floor. (Plan 8/Zone 8).
- Faraday Ward : Ground Floor. (Plan 8/Zone 8).
- Guy Ward : Second Floor. (Plan 9/Zone 9).
- Guy Ward : First Floor. (Plan 9/Zone 9).
- Wren Ward : Second Floor. (Plan 10/Zone 10).
- Hogarth Ward : First Floor. (Plan 10/Zone 10).
- Hillward Ward : Ground Floor. (Plan 10/Zone 10).
- Johnson Ward : First Floor. (Plan 11/Zone 11).
- Jenner Ward : Ground Floor. (Plan 11/Zone 11). Missing.
- Kings Ward : Second Floor. (Plan 12/Zone 12).
- Keats Ward : First Floor. (Plan 12/Zone 12).
- Keller Ward : Ground Floor. (Plan 12/Zone 12).
- Domestic Block (Closed And Unfit For Use) : Second Floor. (Plan 13/Zone 13).
- Domestic Block (Closed And Unfit For Use) : First Floor. (Plan 13/Zone 13).
- Domestic Block (Closed And Unfit For Use) : Ground Floor. (Plan 13/Zone 13).
- Lidget Ward : First Floor. (Plan 14/Zone 14).
- Lettsom Ward : Ground Floor. (Plan 14/Zone 14).
- L&S Landing : First Floor. (Plan 15/Zone 15).
- Occupational Therapy : Ground Floor. (Plan 15/Zone 15).
- Occupational Therapy : Ground Floor. (Plan 16/Zone 16).
- Mapother Ward : First Floor. (Plan 17/Zone 17).
- Mapother Ward : Ground Floor. (Plan 17/Zone 17).
- Social Areas And Offices : Ground Floor. (Plan 18/Zone 18).
- Main Hall/Kitchens : First Floor. (Plan 19/Zone 19,20,36).
- Main Hall/Kitchens : Ground Floor. (Plan 19/Zone 19,20,36).
- Olave Ward : First Floor. (Plan 20/Zone 23).
- Queens Ward : Ground Floor. (Plan 20/Zone 23).
- Pugin Ward : First Floor. (Plan 21/Zone 24).
- Paxton Ward : Ground Floor. (Plan 21/Zone 24).
- Ruskin Ward : First Floor. (Plan 22/Zone 25).
- Rossetti Ward : Ground Floor. (Plan 22/Zone 25).
- Shaftesbury Ward : Second Floor. (Plan 23/Zone 26).
- Shaftesbury Ward : First Floor. (Plan 23/Zone 26).
- Salter Ward : Ground Floor. (Plan 23/Zone 26).
- Turner Ward : First Floor. (Plan 24/Zone 27).
- Turner Ward : Ground Floor. (Plan 24/Zone 27).
- Vincent Ward (Closed And Unfit For Use) : Second Floor. (Plan 25/Zone 28).
- Vincent Ward (Closed And Unfit For Use) : First Floor. (Plan 25/Zone 28).
- Vanbrugh Ward (Closed And Unfit For Use) : Ground Floor. (Plan 25/Zone 28).
- Zachary Ward (Closed And Unfit For Use) : First Floor. (Plan 26/Zone 29)
- Unwin Ward (Closed And Unfit For Use) : Ground Floor. (Plan 26/Zone 29)
- Wren/Wesley: Second Floor. (Plan 27/Zone 30). Missing.
- Wren/Wesley: First Floor. (Plan 27/Zone 30). Missing.
- Wren/Wesley: Ground Floor. (Plan 27/Zone 30). Missing.
- Zachary Ward (Closed And Unfit For Use) : First Floor. (Plan 28/Zone 31)
- York Ward (Closed And Unfit For Use) : Ground Floor. (Plan 28/Zone 31)
- Residences : Second Floor. (Plan 29/Zone 32,33,53)
- Tailoring Dept, Zachary Ward (Closed) : First Floor (Plan 29/Zone 32,33,53)
- Builders' Stores, Sewing Room : Ground Floor (Plan 29/Zone 32,33,53)
- Nightingale Ward: First Floor. (Plan 30/Zone 34)
- Socialisation, Nightingale Ward: Ground Floor. (Plan 30/Zone 34)
- Stores: Ground Floor. (Plan 31/Zone 35)
- Laundry: Ground Floor. (Plan 32/Zone 37)
- Planner & Estimator, Fire Officer's Office, Engineers' MessRoom: First Floor. (Plan 33/Zones 38,39)
- Workshops Stores, Fire Station, Mech/Elec. Workshops: Ground Floor. (Plan 33/Zones 38,39)
- Water Tower, Gatehouse: First Floor. (Plan 34/Zones 40,41,42)
- Builders Workshop, Mortuary, Gatehouse: Ground Floor. (Plan 34/Zones 40,41,42)
- Boiler House: Ground Floor. (Plan 35/Zones 43,44)
- John Hutchingson Centre: Ground Floor. (Plan 36/Zone 45)
Return to: The Cane Hill Project
|